The Power Forecasting System is making an important contribution to the growing renewable energy market in Vietnam. With highly accurate prediction results, the system helps manufacturers maximize business profits and meet state regulations. Not only that, but it also supports operation management, improving the stability of the power grid system. So what is the construction and operation process of the Power Forecasting System? Let’s learn about this solution with PC1 below!

power forecasting system

Introduction to PC1’s Power Forecasting System

The Power Forecasting System solution for wind power plants (WindFor) and solar power plants (SolarFor) is the result of cooperation between a reputable unit and PC1/ITS, in which ITS is a member of the real PC1. currently deploying, connecting software, evaluating, and adjusting the power forecasting system according to the standards of the government / EVN in the Vietnam market.

This is a product that has been operating for more than 15 years and has proven to be the leading predictor in the market today. It can integrate meteorological forecast data from many different providers to improve accuracy. Not to mention the ability to flexibly customize, to meet all needs of time period, forecast frequency, and resolution.

Construction stages of Power Forecasting System

Stages 1 and 2: Project planning and implementation

According to the description of the schedule, in the first week, the parties will sign the contract. This will be the time to introduce, propose and get approval for the Power Forecasting System solution. The contract will then be negotiated and signed.

Over the next 8 weeks, the work to be done will include surveying, ordering, and configuring the system. This is an important stage in the project implementation process. Work such as field surveys and appropriate implementation plans will be started immediately. During that time, another department will order goods, materials, equipment, and accessories needed during the construction and installation of the system.

Stages 3 and 4: Installation, offline configuration for the system, operation, and calibration

The installation phase will be done in about 1 week. Mainly transportation and installation of materials, equipment, and accessories at the construction site. However, depending on the situation at that time, this time period may vary slightly.

Move to the operation and calibration step. This will be the phase that requires the most time, specifically, the project will need 5 months to operate the system after the plant goes into operation and error correction. The data collection will take place for at least 4 months to increase the accuracy of the forecast results.

power forecasting system

How the power forecasting system works

For maximum accuracy over time without manual configuration, the forecasting system is combined with energy data using different methods. These include the use of self-learning and self-calibrating software that combines advanced models and machines. Self-learning and auto-correction algorithms continuously learn about the characteristics of renewable energy production and electricity demand. From there, the system will adapt to the seasonal changes in renewable energy sources.

To do so, it uses artificial intelligence and power system domain knowledge, and combines historical, real-time data on energy production and weather information, to generate forecasts. report at a granular level for each market. In addition, the system uses weather forecast data and automatically detects the priorities for each area.

It is the most accurate power forecasting system available today, provides power forecasting in virtually any format, and can be integrated directly into a customer’s IT platform. Data will be distributed seamlessly to other relevant systems. Capacity forecasting will come with various support, maintenance, and license plans. What’s more, it can be tailored to customer specifications to provide a cost/performance ratio to suit every need.

PC1 Group –  A reputable and professional power forecasting system supplier

After nearly 6 decades of construction and development and high professional capacity, PC1 Group has become a leader in the field of investment and development of renewable energy sources. The company has extensive experience in constructing power forecasting systems for large-scale renewable energy power plant projects, receiving the trust and appreciation of customers and investors.

In addition to meeting the best in terms of equipment and techniques, PC1 Group also owns professional construction human resources, ensuring progress and technical standards. Therefore, when cooperating with PC1 Group, businesses will enjoy the best treatment of solutions from design, equipment supply, installation, and operation to maintenance. Besides, PC1 Group is always committed to bringing prestigious and quality products to customers and investors.

If you are looking for a service provider of power forecasting systems, please contact PC1 Group. We are ready to accompany our customers and bring the best results for the project.

PC1 GROUP JOINT STOCK COMPANY

  • Tax code: 0100100745; Ticker symbol: PC1
  • Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN
  • Solution hotline: 1900 99 88 63
  • Email: epc@pc1group.vn

See more:

Leave a Reply

Your email address will not be published.