Investor: Phuong Anh Trading and Construction Investment Co., Ltd

PC1 is the EPC General Contractor including legal services, technical design and procurement, construction and development, production and installation, testing and commissioning, COD of the entire substation and wind power plant project lines. Hoa Binh 2

Thời gian triển khai: tháng 03/2021 và COD trước 30/09/2021.