Investor: BIM . Wind Power Joint Stock Company
PC1 is the EPC General Contractor including legal services, technical design, procurement, construction, development, production, installation, testing, operation, COD for the entire substation and transmission lines of the Wind Power Plant. BIM
Deployment time: July 2020 and COD before September 31, 2021