Tri Viet Solar Power Plant Project – EPC general contractor

Rate this post

Tay Ninh province is considered a suitable locality for solar energy development. According to data, the radiation intensity in this area reaches 5.1kWh/m²/day. The average amount of sunshine hours per year is significant, reaching up to 2,400. As a result, this place has attracted the attention of many project investors in this industry. The Tri Viet solar power plant project must be mentioned in this context.

An Overview of the Tri Viet Solar Power Plant Project

The project began construction in December 2018 after receiving the investment decision and certificate. Suoi Day commune, Tan Chau district, Tay Ninh province, was the site of the project. The project was finished in June 2019 and commercial operations commenced in July. The Tri Viet Solar Power Plant has a total installed capacity of 30 MWp. Sungrow Group is the investor in the project.

PC1 is responsible for legal services, technical design, procurement, construction, development, production, installation, testing, operation, and COD for the power plant as part of this project.

The Project Scale

The Tri Viet solar power plant project is built on an area of ​​60 hectares of land. 36 hectares are for long-term use, whereas 24 ha are for short-term use. The project is worth over VND 760 billion in total investment capital.

Works to implement the connection plan:

  • Tri Viet solar power’s rising voltage 22/110kV substations have a capacity of 40 MVA, synchronized with the progress of the Tri Viet solar power plant.
  • The Tay Ninh 1 solar power 110kV cut-off station on the 110kV Bourbon – Tay Ninh 220kV substation is connected to the Bach Khoa – A Chau Solar Power Plant Project.
  • The 110kV ACSR120 conductor line runs for 6 kilometers from Tri Viet’s 22/110kV solar power substation to Tay Ninh 1 Solar Power’s 110kV power plant. The line links to the Bach Khoa – A Chau 1 Solar Power Plant Project 110kV line.

In conclusion, the project’s inauguration adds to the province of Tay Ninh’s socio economic development. The project has helped to protect the environment while also reducing expenses.

The leading general contractor for renewable energy plants, EPC PC1

PC1 Group has become a pioneer in the fields of solar power plant general contractor and renewable energy investment after nearly 6 decades of construction and development with high expertise. Customers and investors have given the company their trust and appreciation for its extensive experience in supporting large-scale solar power plant projects. Aside from optimally satisfying equipment and techniques, PC1 also has a team of highly qualified experts and construction consultants who ensure construction progress and technical standards.

As a result, by becoming a PC1 partner, customers will receive the best incentives for solutions ranging from design to equipment supply, installation, operation, and maintenance. Furthermore, PC1 is always committed to bringing prestigious and high-quality works, as well as ensuring the progress of the works for customers and investors.

Customers and businesses who are having trouble deciding on a reputable solar power plant construction unit should contact EPC PC1. We are prepared to accompany our customers until the project is completed in order to achieve the best possible results.

PC1 GROUP JOINT STOCK COMPANY

  • Tax code: 0100100745; Ticker symbol: PC1
  • Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN
  • Hotline EPC:  0978.299.298
  • Email: epc@pcc1.com.vn

Related post: Professional and prestigious EPC general contractor in Vietnam

Leave a Reply

Your email address will not be published.