EPC general contractor for renewable energy projects

Rate this post

PC1 Group, which was founded in 1963, has grown to become one of Vietnam’s top renewable energy firms. Currently, our initiatives account for a considerable portion of the national transmission grid. Our activities include everything from research and development to the design and installation of intelligent solutions for managing and controlling energy systems, particularly renewable energy. EPC general contractor for renewable energy project

Introducing an EPC general contractor for a renewable energy projects, PC1 Group

EPC general contractor

On March 2, 1963, the PC1 Group Joint Stock Company was established. PC1 Group has confirmed its capacity not only in the field of electrical construction and installation, but also in industrial production, energy investment, real estate investment, consulting, and services, after nearly 60 years of construction and development from the initial mission of constructing and installing national power transmission works. PC1’s mission, particularly in the sphere of energy investment, is to focus on renewable energy projects, green technology, and environmentally friendly business structure modifications, reinforcing the company’s new position.

See more: Professional and prestigious EPC general contractor in Vietnam

The importance of renewable energy projects

The importance of renewable energy projects

At the COP26 climate change summit, the heads of the participating countries decided to adopt a net-zero carbon target for 2050, including our country, to avoid global warming from engulfing low-lying islands. To reach this aim, Vietnam will have to replace its fossil-fuel-fired thermal power plants with renewable energy sources. Furthermore, credit loans for fossil fuels have been reduced in order to encourage people to transition to renewable energy. As a result, Vietnam’s renewable energy industry will continue to grow in the future, with enormous potential.

Selection criteria for a recognized and high-quality EPC general contractor for a renewable energy projects

Selection criteria for EPC general contractor for renewable energy projects

Because renewable energy projects have a national economic impact, choosing the right contractor, co-constructor, or co-implementation partner is critical to the project’s success. EPC general contractors, in general, and EPC energy project contractors, in particular, must meet the following requirements:

  • Registered business in accordance with the bidding package’s content
  • Had adequate experience and capacity to perform the EPC contract’s items.

See more: EPC general contractor requirements

Why should renewable energy projects choose PC1 Group as the EPC general contractor?

EPC general contractor for renewable energy projects

  • PC1 Group is the EPC General Contractor for a number of renewable energy projects, and its expertise and methodical work in construction organization are highly valued by investors, oversight consultants, and partners.
  • A qualified workers of engineers and project managers, as well as a fleet of sophisticated specialized machines.
  • Support for RE project development consultancy, project financing (EPC+F) coordination, general contractor for the whole EPC turnkey project, and project maintenance and operation (O & M) services.
  • To ensure project development, assist with site clearing and negotiation with residents and local authorities.
  • Maintain positive relationships with the world’s top renewable energy equipment and materials providers.
  • We have two member companies that specialize in galvanized steel fabrication for renewable energy projects.

The role of the EPC general contractor for renewable energy project of PC1 Group

2018-2020 period

Legal services, engineering design, procurement, construction, development, production, installation, testing, commissioning, and COD for power plants are all included in PC1’s area of duty for the following projects.

Dau Tieng Solar Power Project – 500 MW

  • Investor: Power China Huadong Engineering Corporation Limited
  • Time to complete: June 2018 – March 2019

BIM2, BIM3 solar power project – 300 MWp

  • Investor: BIM Group – AC Energy Group
  • Time to complete: June 2018 – April 2019

Phu My solar power plant project – 330MW

  • Investor: Vision Development Joint Stock Company Charged Energy
  • Time to complete: May 2020 – December 2020

Ninh Phuoc solar power plant project 6.1 & 6.2 – 58.3 MWp

  • Investor: Ninh Thuan Renewable Energy and Agriculture Joint Stock Company
  • Time to complete: December 2018 – June 2019

My Son – Hoan Loc Viet solar power plant project – 50MWp

  • Investor: Hoan Loc Viet Joint Stock Company
  • Time to complete: November 2018 – May 2019

DaMi solar power plant project – 47.5MWp

  • Investor: Power Generation Corporation No.1
  • Time to complete: June 2018 – May 2019

Bach Khoa – A Chau solar power plant project

  • Investor: Sungrow Corporation
  • Time to complete: December 2018 – June 2019

Tri Viet solar power plant project

  • Investor: Sungrow Corporation
  • Time to complete: December 2018 – June 2019

BMT solar power plant project

  • Investor: AC Energy Corporation
  • Time to complete: October 2018 – April 2019

Nhi Ha solar power plant project

  • Investor: Bitexco Energy Joint Stock Company
  • Time to complete: February 2019 – June 2019

Phuoc Thai 1 solar power plant project

  • Investor: Vietnam Electricity Corporation
  • Time to complete: September 2019 – June 2020

Phan Lam 2  solar power plant project

  • Investor: BBG Group
  • Time to complete: June 2020 – November 2020

Project of 110kV-63 MVA Substation Project Dam Nai Wind Power Plant 2

  • Investor: The Blue Circle
  • Time to complete: May 2018 – September 2018

Dai Phong Wind Power Plant Project 50MW

  • Investor: Dai Phong Development Investment Joint Stock Company – The Blue Circle – AC Energy
  • Time to complete: September 2019 – July 2020

2020-2021 period

Legal services, engineering design, procurement, construction, development, production, installation, testing of lines and substations, and COD for electric factories are all included in PC1 Group’s scope of duty for the following projects.

Korea Wind Power Plant Project – Tra Vinh (V1.1)

  • Investor: Tra Vinh 1 Wind Power Company Limited (TWPC)
  • Time to complete: December 2019 – September 2021

Hanbaram Wind Power Plant Project 1, 2

  • Investor: Hanbaram Wind Power Joint Stock Company
  • Time to complete: January 2021 – September 2021

Hung Hai Wind Power Plant Project – 100MW

  • Investor: Hung Hai Wind Power Joint Stock Company – BBG Group
  • Time to complete: January 2021 – October 2021

IAPet Dak Doa Wind Power Plant Project – 199MW

  • Investor: TREE Group
  • Time to complete: March 2021 – October 2021

PC1 is the EPC general contractor for items such as legal services, technical design, procurement, construction, development, production, installation, testing, the entire factory, COD for the entire power plants under the following projects:

Lien Lap Wind Power Plant Project – 48MW

  • Investor: Lien Lap Wind Power Joint Stock Company
  • Time to complete: April 2020 – September 2021

Phong Huy Wind Power Plant Project – 48MW

  • Investor: Phong Huy Wind Power Joint Stock Company
  • Time to complete: April 2020 – September 2021

Phong Nguyen Wind Power Plant Project – 48MW

  • Investor: Phong Nguyen Wind Power Joint Stock Company
  • Time to complete: April 2020 – September 2021

IA Bang 1 Wind Power Plant Project – 50MW

  • Investor: Gia Lai Electricity Joint Stock Company
  • Time to complete: October 2020 – October 2021

Tan Phu Dong Wind Power Plant Project (Nearshore)

  • Investor: Tien Giang Wind Power Joint Stock Company
  • Time to complete: March 2021 – October 2021

See more: List of projects implemented by EPC PC1 Group’s general contractor 

Choosing PC1 Group Joint Stock Company – a reputable and quality partner

PC1 Group is currently the leading EPC general contractor, trusted by customers for the following factors: With a wealth of experience (since 1963) in the fields of electrical construction in general and renewable energy in particular, PC1 Group is currently the leading EPC general contractor, trusted by customers for the following factors:

  • Solid competence: With a team of expert engineers and project managers focused on expanding the renewable energy ecosystem,
  • A prestigious brand: Always on time, providing quality, safety, and aesthetics in the workplace.
  • Dedicated attitude: Provides attentive service and the best solution for consumers.

PC1 Group has been focusing on the goal of being one of the pioneering enterprises in the process, with available solutions and constant attempts to produce new solutions to handle current operating challenges. We’re constructing a long-term energy infrastructure system.

Customers or businesses planning to build a renewable energy plant could contact PC1 Group. We are here to assist you right now.

See more: PC1 portfolio

PC1 GROUP JOINT STOCK COMPANY

  • Tax code: 0100100745; Ticker symbol: PC1
  • Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN
  • Solution hotline: 0981.119.120
  • Email: epc@pcc1.com.vn

Leave a Reply

Your email address will not be published.