The IA Bang 1 Wind Power Plant Project is one of 14 wind power projects added to Gia Lai province’s electricity development plans for 2020. The plant is situated in La Bang commune, Chu Prong district, Gia Lai province.
Nội dung bài viết
The IA Bang 1 Wind Power Plant Project Overview
The IA Bang 1 Wind Power Plant Project was conducted in October 2020. In October 2021, the plant was completed and energized after just a year. The project has a total capacity of 50 MW installed. The annual power output is projected to be around 146,190 MWh. The Gia Lai Electricity Joint Stock Company is the project’s investor.
PC1 is an EPC general contractor that handles legal services, technical design, procurement, construction, development, production, installation, testing of lines and substations, and COD for power plants.
The project’s scale and design
The IA Bang 1 wind power project has a capital investment of up to VND 2,200 billion.A total of VND 660 billion comes from investor capital, while VND 1540 billion comes from bank loans. The entire project had a total area of 305,598 m². In terms of design, the following items and materials are assigned:
Number | Category | Quantity |
1 | 4.2MW Wind Turbine | 10 |
2 | Wind turbine foundation 4.2MW | 10 |
3 | Wind turbine 4MW | 2 |
4 | Wind turbine foundation 4MW | 2 |
5 | Connection line | 3000 m |
6 | Internal roads | 75.600 m² |
7 | Substation 22/110 KV-1*63MVA | 1 |
8 | Executive manager zone | 6000 m² |
Progress of the IA Bang 1 Wind Power Plant project
The IA Bang 1 Wind Power Plant Project is divided into 3 phases as follows:
- Quarter II – IV/2020: preparing feasibility study documents and basic project design, organizing bidding; selection of contractors for consulting, construction, supply and equipment installation.
- December 2020: Commencement of project construction
- October 2021: Completion
The project must have been operational within 50 years of the date of the Decision’s approval.
As a result, when the plant is connected to the grid, it has contributed a substantial power source to the national grid, ensuring national energy security. The project has successfully utilized environmentally friendly and safe energy sources. It therefore contributes to a reduction in CO2 emissions of up to 150 thousand tons per year. At the same time, the initiative creates more jobs, boosts budget revenue, and aids local socioeconomic development.
EPC PC1, a prestigious and professional general contractor
Due to its wealth of experience and high expertise, EPC PC1 has become a pioneer in the fields of wind power plant general contractor and energy investment. The company has extensive experience in the construction of large-scale wind power plant projects, and it has earned the trust and appreciation of customers and investors. Not only does EPC PC1 meet the best in terms of equipment and techniques, but it also has a team of highly qualified construction experts and consultants who ensure the construction progress and technical standards. As a result, by becoming an EPC PC1 partner, businesses will receive the best incentives for solutions ranging from design to equipment supply, installation, operation, and maintenance. Furthermore, EPC PC1 is always committed to bringing quality and effective products to customers and investors, ensuring construction progress.
If your company requires advice on our EPC package and services, please contact EPC PC1 right away to receive the best treatment. We are prepared to accompany your company throughout the construction process in order to ensure the project’s success.
PC1 GROUP JOINT STOCK COMPANY
- Tax code: 0100100745; Ticker symbol: PC1
- Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN
- Hotline EPC: 0978.299.298
- Email: epc@pcc1.com.vn