{"id":6881,"date":"2022-05-06T15:41:17","date_gmt":"2022-05-06T08:41:17","guid":{"rendered":"https:\/\/pc1epc.vn\/?p=6881"},"modified":"2022-05-06T15:42:31","modified_gmt":"2022-05-06T08:42:31","slug":"hoa-binh-2-wind-power-plant","status":"publish","type":"post","link":"https:\/\/pc1epc.vn\/en\/hoa-binh-2-wind-power-plant","title":{"rendered":"H\u00f2a B\u00ecnh 2 Wind Power Plant"},"content":{"rendered":"\n\n
\n \n
\n \n
\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n <\/div>\n \n
\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n <\/div>\n<\/div>\n \n\n
\n 5\/5 - (1 vote) <\/div>\n <\/div>\n

H\u00f2a B\u00ecnh 2 Wind Power Plant<\/p>\n

Investor: Phuong Anh Trading and Construction Investment Co., Ltd<\/p>\n

PC1 is the EPC General Contractor including legal services, technical design and procurement, construction and development, production and installation, testing and commissioning, COD of the entire substation and wind power plant project lines. Hoa Binh 2<\/p>\n

\"\"<\/span><\/p>\n

Th\u1eddi gian tri\u1ec3n khai: th\u00e1ng 03\/2021 v\u00e0 COD tr\u01b0\u1edbc 30\/09\/2021.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"

H\u00f2a B\u00ecnh 2 Wind Power Plant Investor: Phuong Anh Trading and Construction Investment Co., Ltd PC1 is the EPC General Contractor including legal services, technical design and procurement, construction and development, production and installation, testing and commissioning, COD of the entire substation and wind power plant project lines. Hoa Binh 2 Th\u1eddi gian tri\u1ec3n khai:<\/p>\n","protected":false},"author":14,"featured_media":5979,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[552,551],"tags":[],"table_tags":[],"yst_prominent_words":[],"class_list":["post-6881","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-completed-projects","category-electrical-transmission-line"],"_links":{"self":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/comments?post=6881"}],"version-history":[{"count":1,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6881\/revisions"}],"predecessor-version":[{"id":6882,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6881\/revisions\/6882"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media\/5979"}],"wp:attachment":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media?parent=6881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/categories?post=6881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/tags?post=6881"},{"taxonomy":"table_tags","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/table_tags?post=6881"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=6881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}