{"id":6879,"date":"2022-05-06T15:13:08","date_gmt":"2022-05-06T08:13:08","guid":{"rendered":"https:\/\/pc1epc.vn\/?p=6879"},"modified":"2023-02-14T15:02:07","modified_gmt":"2023-02-14T08:02:07","slug":"bim-wind-power-projects","status":"publish","type":"post","link":"https:\/\/pc1epc.vn\/en\/bim-wind-power-projects","title":{"rendered":"BIM wind power projects"},"content":{"rendered":"\n\n
\n \n
\n \n
\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n <\/div>\n \n
\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n
\n \n\n
<\/div>\n <\/div>\n <\/div>\n<\/div>\n \n\n
\n 4.5\/5 - (8 votes) <\/div>\n <\/div>\n

Investor: BIM . Wind Power Joint Stock Company<\/p>\n

PC1 is the EPC General Contractor including legal services, technical design, procurement, construction, development, production, installation, testing, operation, COD for the entire substation and transmission lines of the Wind Power Plant. BIM<\/p>\n

Deployment time: July 2020 and COD before September 31, 2021<\/p>\n

\n\n\t
\n\t\t\t\t
\n\t\t\t\n\t\t\t\n\n \n
\n
\n
\n
\n
\n \"\"
\n <\/div>\n <\/div>\n
\n

<\/p>\n <\/div>\n <\/div>\n <\/a> <\/div>\n <\/div>

\n
\n
\n
\n \"\"
\n <\/div>\n <\/div>\n
\n

<\/p>\n <\/div>\n <\/div>\n <\/a> <\/div>\n <\/div>

\n
\n
\n
\n \"\"
\n <\/div>\n <\/div>\n
\n

<\/p>\n <\/div>\n <\/div>\n <\/a> <\/div>\n <\/div><\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n<\/div>\n

See more: Renewable energy solutions for the 4.0 era<\/span><\/a><\/p>\n

 <\/p>\n

 <\/p>\n","protected":false},"excerpt":{"rendered":"

Investor: BIM . Wind Power Joint Stock Company PC1 is the EPC General Contractor including legal services, technical design, procurement, construction, development, production, installation, testing, operation, COD for the entire substation and transmission lines of the Wind Power Plant. BIM Deployment time: July 2020 and COD before September 31, 2021 See more: Renewable energy solutions<\/p>\n","protected":false},"author":14,"featured_media":5858,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[552,551,540],"tags":[],"table_tags":[],"yst_prominent_words":[],"class_list":["post-6879","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-completed-projects","category-electrical-transmission-line","category-project"],"_links":{"self":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6879","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/comments?post=6879"}],"version-history":[{"count":2,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6879\/revisions"}],"predecessor-version":[{"id":8817,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6879\/revisions\/8817"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media\/5858"}],"wp:attachment":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media?parent=6879"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/categories?post=6879"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/tags?post=6879"},{"taxonomy":"table_tags","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/table_tags?post=6879"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=6879"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}