{"id":6571,"date":"2021-11-09T08:55:22","date_gmt":"2021-11-09T01:55:22","guid":{"rendered":"https:\/\/pc1epc.vn\/?p=6571"},"modified":"2022-05-06T14:10:41","modified_gmt":"2022-05-06T07:10:41","slug":"ben-thanh-suoi-tien-line-ho-chi-minh-city-urban-railway-construction-project","status":"publish","type":"post","link":"https:\/\/pc1epc.vn\/en\/ben-thanh-suoi-tien-line-ho-chi-minh-city-urban-railway-construction-project","title":{"rendered":"Ben Thanh &#8211; Suoi Tien Line, HCM City Urban Railway Construction Project"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Currently, the Ben Thanh &#8211; Suoi Tien railway construction project is being implemented by the investor. This is Line 1 of Ho Chi Minh City&#8217;s urban railway system. The Ben Thanh &#8211; Suoi Tien line is also the first Metro line which located in accordance with Ho Chi Minh City&#8217;s urban planning.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">An Overview of the Ben Thanh &#8211; Suoi Tien Line, HCM City Urban Railway Construction Project<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">On June 1, 2019, the HCM City Urban Railway Project Management Board began construction activities. On June 1, 2022, the project is planned to begin commercial operations. The operation and maintenance support is expected to be completed in 2026. The project is 19.7 kilometers long in total. Line 1 comprises a 2.6-kilometer underground portion with three stations and a 17.1-kilometer elevated portion with 11 stations.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\"><a href=\"https:\/\/pc1epc.vn\/en\/\">PC1<\/a> is the EPC general contractor on this project, which is responsible for the following tasks:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The electrical installation of the entire power supply system for the project with two 110kV underground cables<\/span><\/li>\n<\/ul>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Installing all transformer stations for the Metro Ben Thanh &#8211; Suoi Tien project&#8217;s trains to deliver 1500VDC rectifier current.<\/span><\/li>\n<\/ul>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Carrying out the wiring installation for the project&#8217;s communication and signal systems.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Finance for projects<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The overall investment in the Ben Thanh &#8211; Suoi Tien railway construction project is estimated to be 17.388 billion VND in 2009. The overall investment, however, grew to 47,325 billion VND after calculating and redefining. Nevertheless, as of 2011, the National Assembly had not approved this project. This resulted in a debt issue and slowed project progress from 2017 to 2019.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The Politburo authorized the document to modify the overall investment capital at the beginning of 2019. The authorities of Ho Chi Minh City then agreed to the adjustment of the investment capital at the end of 2019. As a result, following another review, the investment capital was decreased to 43,600 billion VND. Despite the fact that the capital amount was decreased by 3,400 billion VND, all goods were guaranteed to match the design volume.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The electric train model<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The Urban Railway Management Board decided on the color blue for the train&#8217;s exterior after considering all of the opinions. This color, according to the Management Board, portrays a modern, fresh, and environmentally friendly image. The train is equipped with a radio control system as well as an automatic train tracking system. Ascertain that the train is being operated in accordance with the automated system.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">With a standing passenger density of 8 passengers per m\u00b2, the tram on railway line 1 can accommodate up to 930 passengers. Handrails, grab hooks, and positions and assistive devices for individuals with impairments are all included in the train&#8217;s interior.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Route of Ben Thanh &#8211; Suoi Tien line<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The Ben Thanh &#8211; Suoi Tien railway line project has a specific route, which is as follows: The line runs from Ben Thanh (Quoc Thi Trang Square) to Depot Long Binh, passing through Le Loi, Nguyen Sieu, Ngo Van Nam, Ton streets, Duc Thang; Ba Son station, Nguyen Huu Canh, along Van Thanh canal, Dien Bien Phu; the Saigon Bridge, and the Hanoi Highway; and ending at Depot Long Binh.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">In addition, this route will be expanded from Suoi Tien station to Binh Duong, Bien Hoa, and Dong Nai in accordance with the future orientation.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Long Binh Depot<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The depot is located in Thu Duc City&#8217;s Long Binh ward, which spans 27.4 hectares. Until 2040, this will be the control and maintenance center. Operators and maintenance; a ship maintenance workshop; railroads, electrical systems, and communication signals; a ship parking lot; a ship sanitation station; an internal and external road network; and office space are among the infrastructure at the Depot.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Train schedule and speed of the Ben Thanh &#8211; Suoi Tien line<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The train is expected to travel at the following speeds, depending on the route:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">On the elevated portion: 110 km\/h<\/span><\/li>\n<\/ul>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Underground portion: 80 km\/h<\/span><\/li>\n<\/ul>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Station entrance area: 35 km\/h<\/span><\/li>\n<\/ul>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Station area: 25 km\/h.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The ship&#8217;s operating schedule is as follows:<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><span style=\"font-weight: 400;\">Stage<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Distance of time<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Timetable<\/span><\/td>\n<td><span style=\"font-weight: 400;\">The number of ships in operation<\/span><\/td>\n<\/tr>\n<tr>\n<td rowspan=\"2\"><span style=\"font-weight: 400;\">Peak hours<\/span><\/td>\n<td rowspan=\"2\"><span style=\"font-weight: 400;\">2 minutes 10 seconds<\/span><\/td>\n<td><span style=\"font-weight: 400;\">05:30 ~ 09:30<\/span><\/td>\n<td rowspan=\"2\"><span style=\"font-weight: 400;\">111<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">16:00 ~ 20:00<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Normal hours<\/span><\/td>\n<td><span style=\"font-weight: 400;\">5 minutes<\/span><\/td>\n<td><span style=\"font-weight: 400;\">09:30 ~ 16:00 &#8211; 20:00 ~ 23:30<\/span><\/td>\n<td><span style=\"font-weight: 400;\">126<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">As a result, the Ben Thanh &#8211; Suoi Tien railway project offer ideal conditions for people to move around. Simultaneously, to stimulate urban growth along the route, contribute to traffic congestion reduction on major routes, and meet regional socio-economic development objectives.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Why should you choose an EPC PC1 general contractor?<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 Group has become a pioneer in the fields of infrastructure general contractor and energy investment after nearly 60 years of construction and development with high expertise. Customers and investors have given the company their trust and appreciation for its extensive experience in supporting large-scale infrastructure projects. Aside from optimally satisfying equipment and techniques, PC1 also has a team of highly qualified experts and construction consultants who ensure construction progress and technical standards.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">As a result, by becoming a PC1 partner, customers will receive the best incentives for solutions ranging from design to equipment supply, installation, operation, and maintenance. Furthermore, PC1 committed to bringing prestigious and high-quality works, as well as ensuring the progress of the works for customers and investors.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">If you are looking for an EPC professional contractor, please contact PC1 Group using the information provided below. We prepared to accompany your company until the project is completed in order to achieve the best possible results.<\/span><\/p>\n<p style=\"text-align: justify;\"><b>PC1 GROUP JOINT STOCK COMPANY<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Tax code: 0100100745; Ticker symbol: PC1<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Solution hotline: 0981.119.120<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Email: epc@pcc1.com.vn<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><div class=\"row\"  id=\"row-1438626559\">\n<p style=\"text-align: justify;\">\n\t<div id=\"col-1525114730\" class=\"col small-12 large-12\"  >\n\t\t\t\t<div class=\"col-inner\"  >\n\t\t\t\n\t\t\t\n<p style=\"text-align: justify;\">\n  \n    <div class=\"row large-columns-4 medium-columns-3 small-columns-2\" >\n  <div class=\"gallery-col col\" >\n          <div class=\"col-inner\">\n            <a class=\"image-lightbox lightbox-gallery\" href=\"https:\/\/pc1epc.vn\/wp-content\/uploads\/2021\/10\/tu-bu-cong-suat-pk-.jpg\" title=\"\">            <div class=\"box has-hover gallery-box box-overlay dark\">\n              <div class=\"box-image\" >\n                <img loading=\"lazy\" decoding=\"async\" width=\"711\" height=\"400\" src=\"https:\/\/pc1epc.vn\/wp-content\/uploads\/2021\/10\/tu-bu-cong-suat-pk--711x400.jpg\" class=\"attachment-medium size-medium\" alt=\"\" ids=\"4293,4296\" srcset=\"https:\/\/pc1epc.vn\/wp-content\/uploads\/2021\/10\/tu-bu-cong-suat-pk--711x400.jpg 711w, https:\/\/pc1epc.vn\/wp-content\/uploads\/2021\/10\/tu-bu-cong-suat-pk--510x287.jpg 510w, https:\/\/pc1epc.vn\/wp-content\/uploads\/2021\/10\/tu-bu-cong-suat-pk--768x432.jpg 768w, https:\/\/pc1epc.vn\/wp-content\/uploads\/2021\/10\/tu-bu-cong-suat-pk--600x338.jpg 600w, https:\/\/pc1epc.vn\/wp-content\/uploads\/2021\/10\/tu-bu-cong-suat-pk-.jpg 1280w\" sizes=\"auto, (max-width: 711px) 100vw, 711px\" \/>                                  <div class=\"overlay fill\"\n                      style=\"background-color: rgba(0,0,0,.15)\">\n                  <\/div>\n                                                              <\/div>\n              <div class=\"box-text text-left\" >\n                 <p><\/p>\n              <\/div>\n            <\/div>\n            <\/a>          <\/div>\n         <\/div><\/div>\n<p style=\"text-align: justify;\">\t\t<\/div>\n\t\t\t\t\t<\/div>\n\n\t\n<p style=\"text-align: justify;\"><\/div>\n<h4>Related post: <a href=\"https:\/\/pc1epc.vn\/en\/professional-and-prestigious-epc-general-contractor-in-vietnam\/\">Professional and prestigious EPC general contractor in Vietnam<\/a><\/h4>\n","protected":false},"excerpt":{"rendered":"<p>Currently, the Ben Thanh &#8211; Suoi Tien railway construction project is being implemented by the investor. This is Line 1 of Ho Chi Minh City&#8217;s urban railway system. The Ben Thanh &#8211; Suoi Tien line is also the first Metro line which located in accordance with Ho Chi Minh City&#8217;s urban planning. An Overview of<\/p>\n","protected":false},"author":16,"featured_media":6572,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[553,540],"tags":[],"yst_prominent_words":[],"class_list":["post-6571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-implementing-projects","category-project"],"_links":{"self":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/comments?post=6571"}],"version-history":[{"count":1,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6571\/revisions"}],"predecessor-version":[{"id":6574,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6571\/revisions\/6574"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media\/6572"}],"wp:attachment":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media?parent=6571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/categories?post=6571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/tags?post=6571"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=6571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}