{"id":6549,"date":"2021-04-15T16:32:42","date_gmt":"2021-04-15T09:32:42","guid":{"rendered":"https:\/\/pc1epc.vn\/?p=6549"},"modified":"2022-04-15T16:36:24","modified_gmt":"2022-04-15T09:36:24","slug":"lien-lap-wind-power-plant-project-epc-general-contractor","status":"publish","type":"post","link":"https:\/\/pc1epc.vn\/en\/lien-lap-wind-power-plant-project-epc-general-contractor","title":{"rendered":"Lien Lap Wind Power Plant Project &#8211; EPC general contractor"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The Lien Lap Wind Power Plant project was built in three communes in the Huong Hoa district, Quang Tri province. This is one of 16 projects in the Huong Hoa district to gain COD recognition prior to the FIT&#8217;s end date.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">An Overview of the Lien Lap Wind Power Plant Project<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">In April 2020, the Lien Lap Wind Power Plant Project launched construction. By September 2021, the construction party officially completed all project work. The project has a total capacity of 48MW installed. Lien Lap Wind Power Joint Stock Company is the project&#8217;s investor.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\"><a href=\"https:\/\/pc1epc.vn\/en\/\">PC1<\/a> is an EPC general contractor that handles legal services, technical design, procurement, construction, development, production, installation, testing of lines and substations, and COD for power plants.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project&#8217;s scale and design<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The plant was constructed on 48 hectares of land in the Huong Hoa district, Quang Tri province. The plant, which has significant scale and capacity, has a total investment of more than VND 1,973 billion. The project will be operational within 50 years of the date of the decision&#8217;s approval.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">According to the plan, the construction contained 12 wind turbines with a capacity of roughly 4 MW per turbine. The Lien Lap Wind Power Plant project also includes funding for the construction of a 110 kV transformer station with a capacity of one 110\/35 kV 63 MVA transformer. A two-busbar arrangement is used on the 110 kV side. The total transformer T1 in series with the 110kV TBA busbar of the Huong Tan wind power station is exposed in one compartment. The 35kV side operates under a single busbar system. It has one main transformer compartment, one measuring compartment, and three wind turbine feeder compartments.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The average quantity of power produced each year is 158.8 GWh. It offers a lot of advantages because of its huge power output and purchase price incentives. As a result, consumers can purchase wind electricity at sea for 9.8 cents per kWh (about 2,223 VND); onshore wind power for 8.5 cents per kWh (approximately 1,927 VND). Therefore, electricity has been reliably delivered, contributing to national energy security. Moreover, the Lien Lap Wind Power Plant is a popular tourist destination that attracts visitors. Since then, it has contributed significantly to the province of Quang Tri&#8217;s economic development.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Why should you choose an EPC PC1 general contractor?<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 Group has become a pioneer in the fields of wind power plant general contractor and energy investment after nearly 60 years of construction and development with high expertise. Customers and investors have given the company their trust and appreciation for its extensive experience in supporting large-scale renewable energy plant projects. Aside from optimally satisfying equipment and techniques, PC1 also has a team of highly qualified experts and construction consultants who ensure construction progress and technical standards.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">As a result, by becoming a PC1 partner, customers will receive the best incentives for solutions ranging from design to equipment supply, installation, operation, and maintenance. Furthermore, PC1 is always committed to bringing prestigious and high-quality works, as well as ensuring the progress of the works for customers and investors.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">If you are looking for a professional EPC wind power contractor, please contact PC1 Group using the information provided below. We are prepared to accompany your company until the project is completed in order to achieve the best possible results.<\/span><\/p>\n<p style=\"text-align: justify;\"><b>PC1 GROUP JOINT STOCK COMPANY<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Tax code: 0100100745; Ticker symbol: PC1<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Hotline EPC:\u00a0 0978.299.298<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Email: epc@pcc1.com.vn<\/span><\/li>\n<\/ul>\n<h4>Related post: <a href=\"https:\/\/pc1epc.vn\/en\/professional-and-prestigious-epc-general-contractor-in-vietnam\/\">Professional and prestigious EPC general contractor in Vietnam<\/a><\/h4>\n","protected":false},"excerpt":{"rendered":"<p>The Lien Lap Wind Power Plant project was built in three communes in the Huong Hoa district, Quang Tri province. This is one of 16 projects in the Huong Hoa district to gain COD recognition prior to the FIT&#8217;s end date. An Overview of the Lien Lap Wind Power Plant Project In April 2020, the<\/p>\n","protected":false},"author":16,"featured_media":6282,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[529],"tags":[],"yst_prominent_words":[],"class_list":["post-6549","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6549","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/comments?post=6549"}],"version-history":[{"count":1,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6549\/revisions"}],"predecessor-version":[{"id":6550,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6549\/revisions\/6550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media\/6282"}],"wp:attachment":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media?parent=6549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/categories?post=6549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/tags?post=6549"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=6549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}