{"id":6508,"date":"2021-04-12T14:28:26","date_gmt":"2021-04-12T07:28:26","guid":{"rendered":"https:\/\/pc1epc.vn\/?p=6508"},"modified":"2022-04-15T14:38:58","modified_gmt":"2022-04-15T07:38:58","slug":"bim-2-bim-3-solar-power-projects-epc-general-contractor","status":"publish","type":"post","link":"https:\/\/pc1epc.vn\/en\/bim-2-bim-3-solar-power-projects-epc-general-contractor","title":{"rendered":"BIM 2 BIM 3 solar power projects &#8211; EPC general contractor"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">BIM Group and its partner AC Energy Holdings deployed and built BIM 2 BIM 3 solar power projects in Ninh Thuan. These two units are part of Southeast Asia&#8217;s largest cluster of solar power plants.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">BIM 2 BIM 3 solar power projects overview<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">In June 2018, the BIM 2 solar power plant began construction in two communes, including Phuoc Minh and Phuoc Ninh, in Thuan Nam district, Ninh Thuan province. On April 18 and April 19, 2019, BIM 2 and BIM 3 power plants began generating electricity, two months ahead of planned, officially joining the national grid system. These two factories are among Vietnam&#8217;s top ten typical renewable energy projects for 2021.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">BIM Group&#8217;s solar power facilities, BIM 2 and BIM 3, have a combined capacity of 314MW, with capacities of 250MW and 40MW, respectively. BIM 2 and BIM 3 solar power plants have a capacity of 418 million kWh and 75 million kWh, respectively, and offer an annual electrical output of roughly 418 million kWh and 75 million kWh, respectively.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\"><a href=\"https:\/\/pc1epc.vn\/en\/\">PC1<\/a> is responsible for legal services, technical design, procurement, construction, development, production, installation, testing, operation, and COD for the power plant as part of this project.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The project&#8217;s total investment<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">With a total investment of VND 6,263 billion, the solar power plant began development on a 307.5-hectare site. The following is a breakdown of the capital allotted to the projects:<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><span style=\"font-weight: 400;\">Plant<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Investment<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Land-used area<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">BIM 2 solar power plant<\/span><\/td>\n<td><span style=\"font-weight: 400;\">VND 4,779 billion\u00a0<\/span><\/td>\n<td><span style=\"font-weight: 400;\">247.5 hectares<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">BIM 3 solar power plant<\/span><\/td>\n<td><span style=\"font-weight: 400;\">nearly VND 1,300 billion\u00a0<\/span><\/td>\n<td><span style=\"font-weight: 400;\">60 hectares<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">As a result, the cluster of two solar power plants has a considerable capacity, with over 1 million solar panels installed. Annually, the quantity of electricity generated is estimated to serve roughly 200,000 homes. In addition, the plant helps to the reduction of about 304,400 tons of CO2 discharged into the atmosphere each year.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 Group &#8211; a reputable and professional solar power general contractor<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 Group has become a pioneer in the fields of solar power plant general contractor and\u00a0 energy investment after nearly 6 decades of construction and development with high expertise. Customers and investors have given the company their trust and appreciation for its extensive experience in supporting large-scale solar power plant projects. Aside from optimally satisfying equipment and techniques, PC1 also has a team of highly qualified experts and construction consultants who ensure construction progress and technical standards.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">As a result, by becoming a PC1 partner, customers will receive the best incentives for solutions ranging from design to equipment supply, installation, operation, and maintenance. Furthermore, PC1 is always committed to bringing prestigious and high-quality works, as well as ensuring the progress of the works for customers and investors.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">If your company requires advice on our EPC package and services, please contact EPC PC1 right away to receive the best treatment. We are prepared to accompany your company throughout the construction process in order to ensure the project&#8217;s success.<\/span><\/p>\n<p style=\"text-align: justify;\"><b>PC1 GROUP JOINT STOCK COMPANY<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Tax code: 0100100745; Ticker symbol: PC1<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Hotline EPC:\u00a0 0978.299.298<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Email: epc@pcc1.com.vn<\/span><\/li>\n<\/ul>\n<p>Related post: <a href=\"https:\/\/pc1epc.vn\/en\/professional-and-prestigious-epc-general-contractor-in-vietnam\/\">Professional and prestigious EPC general contractor in Vietnam<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BIM Group and its partner AC Energy Holdings deployed and built BIM 2 BIM 3 solar power projects in Ninh Thuan. These two units are part of Southeast Asia&#8217;s largest cluster of solar power plants. BIM 2 BIM 3 solar power projects overview In June 2018, the BIM 2 solar power plant began construction in<\/p>\n","protected":false},"author":16,"featured_media":6236,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[529],"tags":[],"yst_prominent_words":[],"class_list":["post-6508","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/comments?post=6508"}],"version-history":[{"count":1,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6508\/revisions"}],"predecessor-version":[{"id":6509,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6508\/revisions\/6509"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media\/6236"}],"wp:attachment":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media?parent=6508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/categories?post=6508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/tags?post=6508"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=6508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}