{"id":6506,"date":"2021-04-09T14:14:05","date_gmt":"2021-04-09T07:14:05","guid":{"rendered":"https:\/\/pc1epc.vn\/?p=6506"},"modified":"2022-04-15T14:26:23","modified_gmt":"2022-04-15T07:26:23","slug":"epc-general-contractor-for-a-renewable-energy-project","status":"publish","type":"post","link":"https:\/\/pc1epc.vn\/en\/epc-general-contractor-for-a-renewable-energy-project","title":{"rendered":"EPC general contractor for renewable energy projects"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\"><a href=\"https:\/\/pc1epc.vn\/en\/\">PC1 Group<\/a>, which was founded in 1963, has grown to become one of Vietnam&#8217;s top renewable energy firms. Currently, our initiatives account for a considerable portion of the national transmission grid. Our activities include everything from research and development to the design and installation of intelligent solutions for managing and controlling energy systems, particularly renewable energy. EPC general contractor for renewable energy project<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Introducing an EPC general contractor for a renewable energy projects, PC1 Group<\/span><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4402 aligncenter\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/03\/LOGO-PC1sa.png\" alt=\"EPC general contractor\" width=\"1140\" height=\"324\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">On March 2, 1963, the PC1 Group Joint Stock Company was established. PC1 Group has confirmed its capacity not only in the field of electrical construction and installation, but also in industrial production, energy investment, real estate investment, consulting, and services, after nearly 60 years of construction and development from the initial mission of constructing and installing national power transmission works. PC1&#8217;s mission, particularly in the sphere of energy investment, is to focus on renewable energy projects, green technology, and environmentally friendly business structure modifications, reinforcing the company&#8217;s new position.<\/span><\/p>\n<p>See more: <a href=\"https:\/\/pc1epc.vn\/en\/professional-and-prestigious-epc-general-contractor-in-vietnam\/\">Professional and prestigious EPC general contractor in Vietnam<\/a><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The importance of renewable energy projects<\/span><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4474 aligncenter\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/Renewable-energy-1.jpg\" alt=\"The importance of renewable energy projects\" width=\"750\" height=\"473\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">At the COP26 climate change summit, the heads of the participating countries decided to adopt a net-zero carbon target for 2050, including our country, to avoid global warming from engulfing low-lying islands. To reach this aim, Vietnam will have to replace its fossil-fuel-fired thermal power plants with renewable energy sources. Furthermore, credit loans for fossil fuels have been reduced in order to encourage people to transition to renewable energy. As a result, Vietnam&#8217;s renewable energy industry will continue to grow in the future, with enormous potential.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Selection criteria for a recognized and high-quality EPC general contractor for a renewable energy projects<\/span><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4545 aligncenter\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/Selection-criteria-EPC-general-contractor-for-renewable-energy-projects.jpg\" alt=\"Selection criteria for EPC general contractor for renewable energy projects\" width=\"660\" height=\"364\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Because renewable energy projects have a national economic impact, choosing the right contractor, co-constructor, or co-implementation partner is critical to the project&#8217;s success. EPC general contractors, in general, and EPC energy project contractors, in particular, must meet the following requirements:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Registered business in accordance with the bidding package&#8217;s content<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Had adequate experience and capacity to perform the EPC contract&#8217;s items.<\/span><\/li>\n<\/ul>\n<p>See more: <a href=\"https:\/\/pc1epc.vn\/en\/what-is-an-epc-general-contractor-what-are-the-requirements-for-one\/\">EPC general contractor requirements<\/a><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Why should renewable energy projects choose PC1 Group as the EPC general contractor?<\/span><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4546 aligncenter\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/EPC-general-contractor-for-renewable-energy-projects.jpg\" alt=\"EPC general contractor for renewable energy projects\" width=\"1100\" height=\"800\" \/><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">PC1 Group is the EPC General Contractor for a number of renewable energy projects, and its expertise and methodical work in construction organization are highly valued by investors, oversight consultants, and partners.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A qualified workers of engineers and project managers, as well as a fleet of sophisticated specialized machines.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Support for RE project development consultancy, project financing (EPC+F) coordination, general contractor for the whole EPC turnkey project, and project maintenance and operation (O &amp; M) services.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">To ensure project development, assist with site clearing and negotiation with residents and local authorities.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Maintain positive relationships with the world&#8217;s top renewable energy equipment and materials providers.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">We have two member companies that specialize in galvanized steel fabrication for renewable energy projects.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The role of the EPC general contractor for renewable energy project of PC1 Group<\/span><\/h2>\n<h3 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">2018-2020 period<\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Legal services, engineering design, procurement, construction, development, production, installation, testing, commissioning, and COD for power plants are all included in PC1&#8217;s area of duty for the following projects.<\/span><\/p>\n<p style=\"text-align: justify;\"><b>Dau Tieng Solar Power Project \u2013 500 MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Power China Huadong Engineering Corporation Limited<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: June 2018 \u2013 March 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>BIM2, BIM3 solar power project \u2013 300 MWp<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: BIM Group \u2013 AC Energy Group<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: June 2018 \u2013 April 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phu My solar power plant project \u2013 330MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Vision Development Joint Stock Company Charged Energy<\/span><\/li>\n<\/ul>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: May 2020 &#8211; December 2020<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Ninh Phuoc solar power plant project 6.1 &amp; 6.2 \u2013 58.3 MWp<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Ninh Thuan Renewable Energy and Agriculture Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: December 2018 &#8211; June 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>My Son &#8211; Hoan Loc Viet solar power plant project &#8211; 50MWp<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Hoan Loc Viet Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: November 2018 &#8211; May 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>DaMi solar power plant project \u2013 47.5MWp<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Power Generation Corporation No.1<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: June 2018 &#8211; May 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Bach Khoa &#8211; A Chau solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Sungrow Corporation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: December 2018 &#8211; June 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Tri Viet solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Sungrow Corporation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: December 2018 &#8211; June 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>BMT solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: AC Energy Corporation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: October 2018 &#8211; April 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Nhi Ha solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Bitexco Energy Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: February 2019 &#8211; June 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phuoc Thai 1 solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Vietnam Electricity Corporation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: September 2019 &#8211; June 2020<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phan Lam 2\u00a0 solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: BBG Group<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: June 2020 &#8211; November 2020<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Project of 110kV-63 MVA Substation Project Dam Nai Wind Power Plant 2<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: The Blue Circle<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: May 2018 \u2013 September 2018<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Dai Phong Wind Power Plant Project 50MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Dai Phong Development Investment Joint Stock Company \u2013 The Blue Circle \u2013 AC Energy<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: September 2019 \u2013 July 2020<\/span><\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">2020-2021 period<\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Legal services, engineering design, procurement, construction, development, production, installation, testing of lines and substations, and COD for electric factories are all included in PC1 Group&#8217;s scope of duty for the following projects.<\/span><\/p>\n<p style=\"text-align: justify;\"><b>Korea Wind Power Plant Project \u2013 Tra Vinh (V1.1)<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Tra Vinh 1 Wind Power Company Limited (TWPC)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: December 2019 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Hanbaram Wind Power Plant Project 1, 2<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Hanbaram Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: January 2021 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Hung Hai Wind Power Plant Project \u2013 100MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Hung Hai Wind Power Joint Stock Company \u2013 BBG Group<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: January 2021 \u2013 October 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>IAPet Dak Doa Wind Power Plant Project \u2013 199MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: TREE Group<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: March 2021 \u2013 October 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 is the EPC general contractor for items such as legal services, technical design, procurement, construction, development, production, installation, testing, the entire factory, COD for the entire power plants under the following projects:<\/span><\/p>\n<p style=\"text-align: justify;\"><b>Lien Lap Wind Power Plant Project \u2013 48MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Lien Lap Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: April 2020 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phong Huy Wind Power Plant Project \u2013 48MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Phong Huy Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: April 2020 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phong Nguyen Wind Power Plant Project \u2013 48MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Phong Nguyen Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: April 2020 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>IA Bang 1 Wind Power Plant Project \u2013 50MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Gia Lai Electricity Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: October 2020 \u2013 October 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Tan Phu Dong Wind Power Plant Project (Nearshore)<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Tien Giang Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: March 2021 \u2013 October 2021<\/span><\/li>\n<\/ul>\n<p>See more: <a href=\"https:\/\/pc1epc.vn\/en\/list-of-epc-general-contractor-projects-implemented-by-pc1-group\/\">List of projects implemented by EPC PC1 Group&#8217;s general contractor\u00a0<\/a><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Choosing PC1 Group Joint Stock Company &#8211; a reputable and quality partner<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 Group is currently the leading EPC general contractor, trusted by customers for the following factors: With a wealth of experience (since 1963) in the fields of electrical construction in general and renewable energy in particular, PC1 Group is currently the leading EPC general contractor, trusted by customers for the following factors:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Solid competence: With a team of expert engineers and project managers focused on expanding the renewable energy ecosystem,<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">A prestigious brand: Always on time, providing quality, safety, and aesthetics in the workplace.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dedicated attitude: Provides attentive service and the best solution for consumers.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 Group has been focusing on the goal of being one of the pioneering enterprises in the process, with available solutions and constant attempts to produce new solutions to handle current operating challenges. We&#8217;re constructing a long-term energy infrastructure system.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Customers or businesses planning to build a renewable energy plant could contact PC1 Group. We are here to assist you right now.<\/span><\/p>\n<p>See more: <a href=\"https:\/\/pc1epc.vn\/en\/#tab_portfolio\">PC1 portfolio<\/a><\/p>\n<p style=\"text-align: justify;\"><b>PC1 GROUP JOINT STOCK COMPANY<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Tax code: 0100100745; Ticker symbol: PC1<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Solution hotline: 0981.119.120<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Email: epc@pcc1.com.vn<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>PC1 Group, which was founded in 1963, has grown to become one of Vietnam&#8217;s top renewable energy firms. Currently, our initiatives account for a considerable portion of the national transmission grid. Our activities include everything from research and development to the design and installation of intelligent solutions for managing and controlling energy systems, particularly renewable<\/p>\n","protected":false},"author":16,"featured_media":6218,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[529],"tags":[],"yst_prominent_words":[],"class_list":["post-6506","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/comments?post=6506"}],"version-history":[{"count":1,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6506\/revisions"}],"predecessor-version":[{"id":6507,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6506\/revisions\/6507"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media\/6218"}],"wp:attachment":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media?parent=6506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/categories?post=6506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/tags?post=6506"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=6506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}