{"id":6392,"date":"2022-03-30T08:19:46","date_gmt":"2022-03-30T01:19:46","guid":{"rendered":"https:\/\/pc1epc.vn\/?p=6392"},"modified":"2022-04-15T09:27:08","modified_gmt":"2022-04-15T02:27:08","slug":"epc-pc1-vietnams-most-prestigious-epc-general-contractor","status":"publish","type":"post","link":"https:\/\/pc1epc.vn\/en\/epc-pc1-vietnams-most-prestigious-epc-general-contractor","title":{"rendered":"EPC PC1, Vietnam&#8217;s most prestigious EPC general contractor"},"content":{"rendered":"<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">EPC general contractors which are construction companies that specialize in EPC projects are fully responsible for completing EPC contracts in accordance with the contract signed with the client. In the article below, we&#8217;ve compiled a list of prestigious EPC general contractor in Vietnam, so readers can choose the most suitable one.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Which EPC general contractors are prestigious in Vietnam?<\/span><\/h2>\n<h3 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">EPC PC1\/PC1 Group Joint Stock Company<\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\"><a href=\"https:\/\/pc1epc.vn\/en\/\">PC1 Group Joint Stock Company<\/a> was founded on March 2, 1963. With nearly 60 years of experience, PC1 is currently the country&#8217;s leader in the field of electrical construction and installation, having completed numerous national power transmission projects, including EPC and PC projects up to 500 kV and other high-specificity projects (Gis station, island power supply project, underground cable project,&#8230;).<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Not only that, but PC1 Group has made a breakthrough in the implementation of general contractors for renewable energy power plants, particularly high-tech projects such as wind and solar power plants. The 500 kV Quang Ninh Substation Project, the 500 kV Hiep Hoa Substation Project, the 500 MW Dau Tieng Solar Power Project, and the Wind Power Plant Project, the 50 MW Tan Phu Dong 2 wind power plant project, the 50 MW La Bang 1 wind power plant are examples of PC1&#8217;s work.<\/span><\/p>\n<figure id=\"attachment_4447\" aria-describedby=\"caption-attachment-4447\" style=\"width: 1156px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4447\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/prestigious-EPC-general-contractor-pcc1.jpg\" alt=\"\" width=\"1156\" height=\"800\" \/><figcaption id=\"caption-attachment-4447\" class=\"wp-caption-text\">The 500 kV Quang Ninh Substation Project<\/figcaption><\/figure>\n<h3 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Song Da Corporation<\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Currently, Song Da controls 85 percent of the domestic hydropower construction market, making it Vietnam&#8217;s largest contractor. Over the last 60 years, Song Da Corporation has been the main contractor for most hydroelectric projects in Vietnam, such as Son La, Hoa Binh, Lai Chau, and Huoi Quang hydropower plants. Song Da Corporation also expanded its operations into Laos with projects like Xekaman 1 hydroelectricity, which includes Xekaman Sanxay, Xekaman 3, and Xekaman 4, as well as others. Besides, Song Da Corporation also serves as the EPC general contractor for a number of other projects, including Tuyen Quang, Sesan 3, and others.<\/span><\/p>\n<figure id=\"attachment_4442\" aria-describedby=\"caption-attachment-4442\" style=\"width: 711px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-4442 size-full\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/hoa-binh-hydropower.jpg\" alt=\"prestigious EPC general contractor\" width=\"711\" height=\"400\" \/><figcaption id=\"caption-attachment-4442\" class=\"wp-caption-text\">Hoa Binh hydroelectric<\/figcaption><\/figure>\n<h3 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Vietnam Machinery Erection Corporation<\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">LILAMA (Vietnam Machinery Erection Corporation) is a company founded in 1960. It has been involved in the construction and installation of thousands of key projects in the fields of energy, cement, chemical, petrochemical&#8230; during its more than 60 years of operation.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">LILAMA has worked on important national projects such as the Uong Bi Thermal Power Plant Extension, Ca Mau 1 &amp; 2 Combined Cycle Gas Plant, Nhon Trach 1 &amp; 2 Thermal Power Plant, and Thermal Power Plant, Song Thao Cement, Vung Ang 1, Song Hau 1 thermal power plant, etc as an EPC general contractor.<\/span><\/p>\n<figure id=\"attachment_4448\" aria-describedby=\"caption-attachment-4448\" style=\"width: 591px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-4448 size-full\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/Professional-EPC-general-Contractor.jpg\" alt=\"\" width=\"591\" height=\"374\" \/><figcaption id=\"caption-attachment-4448\" class=\"wp-caption-text\">Vung Ang 1 thermal power plant<\/figcaption><\/figure>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The reasons for the general contractor EPC PC1 Group&#8217;s renown<\/span><\/h2>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Providing all-encompassing construction solutions<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The general contractor EPC PC1 Group will offer construction plans and solutions based on the factory&#8217;s production model and the characteristics of each product line, assisting the investor in lowering costs.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">EPC PC1 offers many technologies and equipment solutions for the Investor to choose from, based on its 55 years of experience in implementing key projects in the field of General Electric Contractors. Furthermore, maintaining good relationships with departments allows you to quickly update information, adjust flexible solutions, and avoid risks for investors during the project development and implementation process.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">High-quality standard<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">By implementing smart factory solutions to reduce factory operating costs, 100% of the work is completed on time, ensuring sustainability criteria, promoting safety, and maximizing production efficiency.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dedicated and professional warranty<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">EPC PC1, the general contractor, will be in charge of overseeing and implementing the construction process. Even after handover, we can provide replacement and maintenance solutions to meet your business&#8217;s needs.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clear and transparent throughout the project&#8217;s approach and implementation.<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Transparency at all stages, from project acceptance to consulting, bidding, implementation organization, handover, and maintenance. All financial plans for EPC PC1 are explicitly stated from the time the contract is signed until the project is turned over, ensuring that there are no hidden expenses or problems.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">List of projects implemented by the prestigious EPC general contractor, EPC PC1<\/span><\/h2>\n<h3 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Power plant projects<\/span><\/h3>\n<p style=\"text-align: justify;\"><b>2018-2020 period<\/b><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">EPC PC1 is the prestigious EPC general contractor for legal services, technical design, procurement, construction, development, production, installation, testing, and operation of power plants, as well as COD for power plants of the following projects:<\/span><\/p>\n<p style=\"text-align: justify;\"><b>Dau Tieng Solar Power Project \u2013 500 MW<\/b><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4446 aligncenter\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/prestigious-EPC-general-contractor.jpg\" alt=\"prestigious EPC general contractor\" width=\"1280\" height=\"719\" \/><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Power China Huadong Engineering Corporation Limited<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: June 2018 \u2013 March 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>BIM2, BIM3 solar power project \u2013 300 MWp<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: BIM Group \u2013 AC Energy Group<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: June 2018 \u2013 April 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phu My solar power plant project \u2013 330MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Vision Development Joint Stock Company Charged Energy<\/span><\/li>\n<\/ul>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: May 2020 &#8211; December 2020<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Ninh Phuoc solar power plant project 6.1 &amp; 6.2 \u2013 58.3 MWp<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Ninh Thuan Renewable Energy and Agriculture Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: December 2018 &#8211; June 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>My Son &#8211; Hoan Loc Viet solar power plant project &#8211; 50MWp<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Hoan Loc Viet Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: November 2018 &#8211; May 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>DaMi solar power plant project \u2013 47.5MWp<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Power Generation Corporation No.1<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: June 2018 &#8211; May 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Bach Khoa &#8211; Asia solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Sungrow Corporation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: December 2018 &#8211; June 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Tri Viet solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Sungrow Corporation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: December 2018 &#8211; June 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>BMT solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: AC Energy Corporation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: October 2018 &#8211; April 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Nhi Ha solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Bitexco Energy Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: February 2019 &#8211; June 2019<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phuoc Thai 1 solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Vietnam Electricity Corporation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: September 2019 &#8211; June 2020<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phan Lam 2\u00a0 solar power plant project<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: BBG Group<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: June 2020 &#8211; November 2020<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Project of 110kV-63 MVA Substation Project Dam Nai Wind Power Plant 2<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: The Blue Circle<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: May 2018 \u2013 September 2018<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Dai Phong Wind Power Plant Project 50MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Dai Phong Development Investment Joint Stock Company \u2013 The Blue Circle \u2013 AC Energy<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: September 2019 \u2013 July 2020<\/span><\/li>\n<\/ul>\n<h4 style=\"text-align: justify;\">The general contractor of stations and lines<\/h4>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Under the following projects, EPC PC1 is the EPC general contractor for legal services, technical design, procurement, construction, development, production, installation, testing of lines and substations, and COD for power plants.<\/span><\/p>\n<p style=\"text-align: justify;\"><b>Korea Wind Power Plant Project \u2013 Tra Vinh (V1.1)<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Tra Vinh 1 Wind Power Company Limited (TWPC)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: December 2019 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Hanbaram Wind Power Plant Project 1, 2<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Hanbaram Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: January 2021 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Hung Hai Wind Power Plant Project \u2013 100MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Hung Hai Wind Power Joint Stock Company \u2013 BBG Group<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: January 2021 \u2013 October 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>IAPet Dak Doa Wind Power Plant Project \u2013 199MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: TREE Group<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: March 2021 \u2013 October 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b><i>The general contractor of wind power plants<\/i><\/b><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 is the EPC general contractor for items such as legal services, technical design, procurement, construction, development, production, installation, testing, the entire factory, COD the entire factory for power plants under the following projects:<\/span><\/p>\n<p style=\"text-align: justify;\"><b>Lien Lap Wind Power Plant Project \u2013 48MW<\/b><\/p>\n<figure id=\"attachment_4443\" aria-describedby=\"caption-attachment-4443\" style=\"width: 749px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4443\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/lien-lap-wind-power-project.jpg\" alt=\"Prestigious EPC general contractor\" width=\"749\" height=\"399\" \/><figcaption id=\"caption-attachment-4443\" class=\"wp-caption-text\">Phong Huy, Phong Nguyen, Lien Lap wind power plant project cluster<\/figcaption><\/figure>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Lien Lap Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: April 2020 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phong Huy Wind Power Plant Project \u2013 48MW<\/b><\/p>\n<figure id=\"attachment_4445\" aria-describedby=\"caption-attachment-4445\" style=\"width: 1400px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4445\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/phong-nguyen-2-wind-power.jpg\" alt=\"\" width=\"1400\" height=\"788\" \/><figcaption id=\"caption-attachment-4445\" class=\"wp-caption-text\">Phong Huy, Phong Nguyen, Lien Lap wind power plant project cluster<\/figcaption><\/figure>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Phong Huy Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: April 2020 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Phong Nguyen Wind Power Plant Project \u2013 48MW<\/b><\/p>\n<figure id=\"attachment_4444\" aria-describedby=\"caption-attachment-4444\" style=\"width: 1372px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4444\" src=\"https:\/\/en.pc1epc.vn\/wp-content\/uploads\/2022\/04\/phong-huy-wind-power.jpg\" alt=\"Prestigious EPC general contractor\" width=\"1372\" height=\"800\" \/><figcaption id=\"caption-attachment-4444\" class=\"wp-caption-text\">Phong Huy, Phong Nguyen, Lien Lap wind power plant project cluster<\/figcaption><\/figure>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Phong Nguyen Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: April 2020 \u2013 September 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>IA Bang 1 Wind Power Plant Project \u2013 50MW<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Gia Lai Electricity Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: October 2020 \u2013 October 2021<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><b>Tan Phu Dong Wind Power Plant Project (Nearshore)<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Tien Giang Wind Power Joint Stock Company<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time to complete: March 2021 \u2013 October 2021<\/span><\/li>\n<\/ul>\n<h3 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Building and Infrastructure projects<\/span><\/h3>\n<p style=\"text-align: justify;\"><b>Construction of urban railway in Ho Chi Minh City: Ben Thanh-Suoi Tien Line (Line 1)<\/b><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Investor: Ho Chi Minh City Urban Railway Project Management Board (MAUR)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Period of deployment: 1\/6\/2019 &#8211; 1\/6\/2022<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PCC1 is the general contractor performing the following works:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The electrical installation of the entire power supply system for the project with two 110kV underground cables<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Installing all transformer stations to supply 1500 VDC rectifier current for the trains of the Metro Ben Thanh-Suoi Tien project<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Carrying out wiring installation for all communication and signal systems of the project.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span style=\"font-weight: 400;\">What are the benefits of working with EPC PC1, a general contractor?<\/span><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">PC1 Group has established itself as a market leader in the field of EPC general contractor for renewable energy plants, thanks to its wealth of experience and expertise. The company has extensive experience in the construction of large-scale renewable energy plant projects, earning the trust and appreciation of customers and investors. Not only does PC1 have the best equipment and techniques, but it also has professional construction human resources, which ensures construction progress and technical standards. As a result, by becoming a PC1 partner, businesses will receive the best incentives for service packages ranging from design to equipment supply, installation, operation, and maintenance. Furthermore, PC1 is always committed to bringing prestigious and high-quality works, as well as ensuring the progress of the works for customers and investors.<\/span><\/p>\n<p style=\"text-align: justify;\"><b>PC1 GROUP JOINT STOCK COMPANY<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Tax code: 0100100745; Ticker symbol: PC1<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Hotline EPC:\u00a0 0978.299.298<\/span><\/li>\n<li style=\"font-weight: 400; text-align: justify;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Email: epc@pcc1.com.vn<\/span><\/li>\n<\/ul>\n<h4>Related post: <a href=\"https:\/\/pc1epc.vn\/en\/professional-and-prestigious-epc-general-contractor-in-vietnam\/\">Professional and prestigious EPC general contractor in Vietnam<\/a><\/h4>\n","protected":false},"excerpt":{"rendered":"<p>EPC general contractors which are construction companies that specialize in EPC projects are fully responsible for completing EPC contracts in accordance with the contract signed with the client. In the article below, we&#8217;ve compiled a list of prestigious EPC general contractor in Vietnam, so readers can choose the most suitable one. Which EPC general contractors<\/p>\n","protected":false},"author":16,"featured_media":6424,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[529],"tags":[],"yst_prominent_words":[],"class_list":["post-6392","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6392","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/comments?post=6392"}],"version-history":[{"count":1,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6392\/revisions"}],"predecessor-version":[{"id":6412,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6392\/revisions\/6412"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media\/6424"}],"wp:attachment":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media?parent=6392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/categories?post=6392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/tags?post=6392"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=6392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}