<\/span><\/h3>\nThe design, construction, scale, and technical requirements of each task or project will be unique. PC1 Group will then propose solutions and construction plans to help investors reduce expenses.<\/span><\/p>\nFrom surveying, design, consulting, compensation and clearance, legal assistance, COD to procurement of materials and equipment, operating and managing projects, PC1 Group offers complete solutions. We supervise subcontractors, install experiments, and calibrate for the following projects:<\/span><\/p>\n\n- Power plant projects:Wind power plants, solar power plants, and hydroelectric plants<\/span><\/li>\n
- Power grid projects include: grid connection, substations, roads<\/span><\/li>\n
- Infrastructure projects include: railway lines<\/span><\/li>\n<\/ul>\n
<\/span>Standard quality<\/span><\/span><\/h3>\nPC1 Group’s work quality as a general contractor consistently earns positive feedback and praise from partners. This also validates the general contractor’s identity and prestigious, EPC PC1 Group. PC1 is also a investor in a number of renewable energy plants that fulfill international social and environmental standards, contributing to Vietnam’s energy security and clean energy sources.<\/span><\/p>\nPC1 gained trust and became the first firm to secure a grant from the Asian Development Bank for a wind power project in Vietnam as a result of their high-quality work. Other foreign organizations, such as the Export Credit Authority of Australia (EFA) and the Japan International Cooperation Agency, are also co-sponsors of this project (JICA). As a result, the quality of work conducted by PC1 as the general contractor was not only recognized by domestic partners, but also helped to solidify PC1’s position in the worldwide market.<\/span><\/p>\n<\/span>Dedicated and professional warranty<\/span><\/span><\/h3>\nPC1 Group’s warranty procedure includes the following steps:<\/span><\/p>\n\n- Receipt of construction warranty claim information<\/span><\/li>\n<\/ol>\n
If the work is found to be broken or defective during the warranty period, the investor can notify PC1 Group in writing or phone the PC1 Group warranty hotline.<\/span><\/p>\n\n- Actual inspection of work<\/span><\/li>\n<\/ol>\n
PC1 will contact clients after receiving their information to verify the problem.<\/span><\/p>\n\n- Provide warranty and solution options.<\/span><\/li>\n<\/ol>\n
Determine the warranty claim in line with the provisions of the signed contract after conducting an analysis and appraisal of the cause. PC1 Group will provide customers with the best solutions and solutions while minimizing the impact on production and other activities.<\/span><\/p>\n\n- Project warranty deployment<\/span><\/li>\n<\/ol>\n
PC1 Group will perform warranty work after gaining investor clearance. The investor is responsible for examining and pre-approving the work during the warranty period to ensure the best possible warranty work.<\/span><\/p>\n\n- Confirmation of the warranty’s completion<\/span><\/li>\n<\/ol>\n
After the warranty period has expired, PC1 will send the investor a report on the warranty work that has been completed. The owner is responsible for confirming in writing that PC1’s warranty has been fulfilled.<\/span><\/p>\n<\/span>Clarity and transparency throughout the whole project strategy and implementation process<\/span><\/span><\/h3>\nTransparency during every level of the project, including project reception, consulting, bidding, implementation, handover, warranty, and maintenance. From the time the contract is signed to the time the project is handed over, PC1 Group’s financial plans are fully disclosed, ensuring that there are no hidden expenses or complications.<\/span><\/p>\nPC1 Group commits to make the winning bid price, as well as the contract signing, contract closing, and investment capital settling prices, public and transparent. Ascertain that the winning bid price corresponds to the contract signing price, ensuring that the contract settling price is identical to the contract price.<\/span><\/p>\nCustomers or businesses planning to build a renewable energy plant could contact PC1 Group. We are here to support you now.<\/span><\/p>\nPC1 GROUP JOINT STOCK COMPANY<\/b><\/p>\n\n- Tax code: 0100100745; Ticker symbol: PC1<\/span><\/li>\n
- Building CT2-No. 583 Nguyen Trai, Thanh Xuan, Hanoi, VN<\/span><\/li>\n
- Solution hotline: 0981.119.120<\/span><\/li>\n
- Email: epc@pcc1.com.vn<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"
PC1 Group Joint Stock Company is presently leading the country in the field of electricity construction and installation, with experience in implementing numerous national power transmission projects, particularly general projects, with approximately 60 years of building and development. EPC, PC contractors, and projects with very particular requirements Let’s find out more about PC1 and why<\/p>\n","protected":false},"author":14,"featured_media":6219,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[529],"tags":[],"table_tags":[],"yst_prominent_words":[],"class_list":["post-6314","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/comments?post=6314"}],"version-history":[{"count":4,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6314\/revisions"}],"predecessor-version":[{"id":6338,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/posts\/6314\/revisions\/6338"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media\/6219"}],"wp:attachment":[{"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/media?parent=6314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/categories?post=6314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/tags?post=6314"},{"taxonomy":"table_tags","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/table_tags?post=6314"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/pc1epc.vn\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=6314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}